In early 2009 we began construction of the Tod Engine Building. A 45' x 60' prefabricated steel building was ordered from Shenango Steel Buildings in West Middlesex, PA. Concrete piers were poured on 6' x 6' x 12" footer pads to spread the weight of the structure to the soil.


The steelwork was erected using an Insley K-12 crawler crane. Runways were added for an 1893 Morgan overhead crane that had been donated by Eddie Kane Steel Co.


The Morgan crane in position on its runways and corrugated sheeting in place.

Although we constructed the building in 2009, it wasn't until 2012 that we had the resources to complete the end walls.